送20點!原文需要翻譯~請幫我英翻中

拜託幫我翻譯一下 可以另開網頁再送20點 HCM Highway funding swells (10-05-2007) Ha Noi — The Government has decided to increase funding for the construction of the Ho Chi Minh Highway, phase 1 to VND13 trillion (US$832 million). According to Decision No 539/QD-TTg, the first phase of construction will focus on the... 顯示更多 拜託幫我翻譯一下
可以另開網頁再送20點

HCM Highway funding swells

(10-05-2007)

Ha Noi — The Government has decided to increase funding for the construction of the Ho Chi Minh Highway, phase 1 to VND13 trillion (US$832 million).

According to Decision No 539/QD-TTg, the first phase of construction will focus on the sections of road to run between Hoa Lac-Xuan Mai-Cam Lo; Thanh My-Ngoc Hoi-Tan Canh and Khe Cat-Khe Sanh and DakRong-Thanh My.

In addition, the Prime Minister has also decided to lengthen some existing roads. This will also take place under the first phase.

They include the Nghi Son-Bai Tranh, to be extended by 54km; a road connecting the HCM Highway with Uncle Ho’s native village of Kim Lien (24 km); a road connecting the HCM Highway with the Phong Nha-Ke Bang heritage site recognised by UNESCO (2.5 km); the Hue diverse road (37 km); and finally National Highway 14b (55 km).

Under the decision, the construction of these roads must be completed this year.

The decision has also detailed a 1.2 km section of fly-over to be built as part of the 7.5 km road running through Cuc Phuong National Park. The elevated road for traffic and pedestrians will be constructed in order to protect the many endangered species found in the park. — VNS
4 個解答 4