The common unrealistic assumption of the above joint inventory models is that all the received materials are of perfect quality. However, the defective materials or the pool quality materials will be found during the screening process that is followed by the arrival of shipments. Hence, we developed a serial multi-echelon integrated JIT inventory model that considerate of uncertain delivery lead time and quality unreliability of received items simultaneously in this book

2 個解答

評分
  • Paige
    Lv 5
    9 年前
    最佳解答

    關於上述聯合存貨模式,最普遍也不符實際的假設就是所有的進貨都是零缺失.

    但實際上是,當貨品簽收後,在檢驗過程,瑕疵品或品質不夠好的產品絕對會被發現. 因此我們建立了連續多層整合的JIT (即時)存貨模式,這個模式同時考量了不確定的前置期和產品品質的不可靠性.

    2010-12-12 01:49:28 補充:

    題外話了...

    看原文似乎這是出自一本書....

    那麼這本書我認為它對JIT的理解並不當...因為 JIT沒有辦法針對quality做修正,它只能對存貨時間和成本進行大幅度的改善.

    因為qaulity最主要的原因還是來自產商內部的作業系統過程,生產線...人工素質,訓練, 成品檢驗....JIT沒有辦法幫助這些這些...

    要讓JIT能被成功運用,最好的方式就是選一個品質最值得信賴的廠商....

    如果原文不是出自一本書,而是來自一個推銷JIT inventory system的廠商,那麼考慮這個 system的公司,我會建議多考慮其他家的proposal了...

    參考資料: Self
  • 常見的不切實際的假設上述聯合庫存模式是,所有收到的材料是完美的品質。然而,有缺陷的材料或游泳池品質的材料會被發現,在篩選過程,其次是貨物的到來。因此,我們開發了系列多級綜合 JIT存貨模型,周到的不確定交貨時間和質量不可靠的項目同時獲得這本書